Avenue Road

À la recherche de nouvelles concernant des travaux près d’une i

Choisissez une intersection dans le menu déroulant ci-dessous pour obtenir tous les renseignements et dernières nouvelles sur la construction dans cette zone. Les intersections sont indiquées d’ouest en est, Eglinton étant la principale rue perpendiculaire.

Syndiquer le contenu
 
septembre 082017

UPDATED: Dewatering System at Avenue Station

Updates: September 8, 2017
Latest Issue Date: May 15, 2017
Original Issue Date: April 17, 2017

 

What Work is Happening? Lire la suite »

septembre 072017

Chaplin - Avenue Construction Liaison Committee Meeting

The construction liaison committee meeting of Chaplin and Avenue Stations was held on September 6, 2017. You can see the presentation here:

Lire la suite »

août 292017

Pedestrian Safety near Construction Sites

The tunnelled section between Brentcliffe Road and Black Creek Drive is complete, and last year, construction activities began at all 15 underground stations including Kennedy Station. The preparatory works at the at-grade portion of the line, between Brentcliffe Road and Kennedy Station, also started this summer. Since the end of school, many work zones have been set up for construction and some major intersections along Eglinton Avenue have changed.

Lire la suite »

août 102017

Avenue Station Secondary Entrance Sound Wall

Original Issue Date: July 6, 2017
Re-issue Date: August 10, 2017 

What Work is Happening?

Starting as early as Friday, August 11, work will begin to construct a sound barrier wall at the north side of the secondary entrance. This wall is engineered for maximum sound reduction and will be in place until construction of the station nears completion.

Hours of Work/ What to Expect Lire la suite »

août 102017

Overnight Preparatory Works for Sewer Lining at Avenue Station

Overnight Preparatory Works for Sewer Lining at Avenue Station

In advance of upcoming mining works at Avenue Station, crews must install sewer linings to the existing sewer infrastructure in the vicinity of the station on Eglinton Avenue West between Braemar Avenue and Lascelles Boulevard. Work also includes one location at Avenue Road and Burnaby Boulevard, as well as one location on Highbourne Road and one on Oriole Parkway. Lire la suite »

juillet 132017

Overnight Watermain Investigations near Avenue Station

What Work is Happening?

To prepare for upcoming mining works at Avenue Station, a careful inspection of watermains in the area is required. 

Crews will complete water leakage detection for the watermains in the vicinity of the future station box. The scope of work includes testing watermains and associated fittings on Eglinton Avenue West between Avenue Road and Lascelles Blvd. Lire la suite »

juillet 062017

Chaplin - Avenue Construction Liaison Committee Meeting

The construction liaison committee meeting of Chaplin and Avenue Stations was held on July 5, 2017. You can see the presentation here:

juin 072017

Chaplin - Avenue Construction Liaison Committee Meeting

The construction liaison committee meeting of Chaplin and Avenue Stations was held on June 6, 2017. You can see the presentation here:

mai 312017

Avenue Station Open House

Thank you for attending our Avenue Station Open House on May 30, 2017.

For those of you who missed it, the presentation is here:

mai 182017

Utilities and Site Service Connections at Avenue Station

Crews will complete works to connect water and sewer services at the main and secondary entrances and designated park area for Avenue Station. Crews are also performing hydro utility works in the designated park area to complete a temporary power connection.  For the safety of the public and workers, temporary pedestrian and traffic changes will be in effect to accommodate this work.  Work will occur in stages to minimize traffic disruptions. Lire la suite »