Birchmount Road

À la recherche de nouvelles concernant des travaux près d’une i

Choisissez une intersection dans le menu déroulant ci-dessous pour obtenir tous les renseignements et dernières nouvelles sur la construction dans cette zone. Les intersections sont indiquées d’ouest en est, Eglinton étant la principale rue perpendiculaire.

Syndiquer le contenu
 
août 162019

Traction Power Substation Construction Continues at Birchmount Road

What Work is Taking Place?

As part of construction of the future surface alignment for the Eglinton Crosstown LRT, crews will be conducting work on the Traction Power Substation (TPSS) 12, located on the north east corner of Birchmount Road and Eglinton Avenue East intersection. Starting as early as August 23, 2019 and lasting for approximately one (1) week. 

The north sidewalk on Eglinton Avenue East will remain closed in order to carry out the work safely. Lire la suite »

juillet 102019

Update: Eastbound Left Turn Reinstated at Rosemount Drive at Eglinton Avenue East

What Work is Taking Place?

As part of the ongoing works to build the LRT system along Eglinton Avenue East, crews will be replacing the existing culvert at Massey Creek. Work began as early as late February 2019 and will last for approximately nine (9) months. The creek is located at the signalized intersection of Eglinton Avenue East and Rosemount Drive. Lire la suite »

juin 192019

Guideway Work at Birchmount Road

Guideway Work Birchmount Road

What Work is Taking Place?

  

As part of construction of the future surface alignment for the Eglinton Crosstown LRT, crews will be continuing guideway work in the center of Eglinton Avenue East. As early as July 1, 2019 the construction zone will shift to the centre of Eglinton Avenue East at Birchmount Road and be in place for approximately six (6) weeks. Lire la suite »

juin 132019

Weekend Traffic Restrictions at Birchmount Road

Latest Update: July 5, 2019

What Work is Taking Place?

The north side pavement reconstruction works at Eglinton Avenue East and Birchmount Road will be moved to July 6/7 (from June 29/30). The guideway work in the centre of Eglinton Avenue East will now be in place as July 8th.

Hours of Work Lire la suite »

juin 102019

Upcoming Hydro Outages

UPDATED: Planned Hydro Outages in June 2019

 

In support of construction of the future Crosstown Light Rail Transit, crews have been upgrading and relocating existing overhead and underground hydro utilities between Birchmount Road and Kennedy Road along Eglinton Avenue East. Outages are required to switch services to the new infrastructure. Lire la suite »

mai 312019

Update: Construction Underway for Traction Power Substation 12

Updated: Construction Underway for Traction Power Substation 12

What Work is Taking Place? Lire la suite »

mai 292019

Updated: Construction Begins for Traction Power Substation 12

What Work is Taking Place?

As part of continued support of the future surface alignment for the Eglinton Crosstown LRT, crews will be commencing construction of the Traction Power Substation (TPSS) 12 that will power the Eglinton Crosstown Light Rail Transit (ECLRT) line. The work will take place in a fenced work zone located on the north east side of Birchmount Road in close proximity to Toronto Police Service 41 Station. Lire la suite »

avril 112019

Eastern Works Open House

Thank you for attending the Eastern Work Open House on April 10, 2019. For those of you who missed it, the presentation is here:

Download the presentation

avril 102019

OVERNIGHT UTILITIES RELOCATIONS AT BIRCHMOUNT ROAD AND EGLINTON AVENUE EAST

WHAT WORK IS TAKING PLACE?