Chaplin Crescent

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

Syndicate content
 
November 172014

Cross Passage Construction Update – November 2014

Information as of November 5, 2014

What is the Crosstown?

The Eglinton Crosstown is a 19-kilometre light rail transit (LRT) line that will run along Eglinton Avenue through the heart of Toronto, with an underground central section. The line will connect Mount Dennis in the west to Kennedy Road in the east, and the new service will be up to 60% faster than the bus service today. 

Did you know? Read more »

October 152014

Cross Passage Headwall Construction for Twin Tunnels Stage 2 – Southside Switch - UPDATE

What we are building

What: A cross passage is a smaller tunnel placed between two other parallel tunnels for maintenance or emergency purposes. Crews will be building one headwall for the cross-passage required for future maintenance of the tunnels. Headwalls are underground support walls. Read more »

September 122014

Cross Passage Headwall Construction near Duncannon Drive - Stage 1

What we are building

What: A cross passage is a tunnel cut between two other parallel tunnels required for maintenance or emergency purposes. Crews will be building one headwall for the future cross-passage required for future maintenance of the tunnels.  Read more »

September 032014

Open houses in September

Metrolinx is hosting three open houses in September at various locations along the Eglinton corridor to provide an update on current Crosstown construction.

Join us at one of the following sessions to hear what is happening, why it needs to happen and how it may impact you:

Tuesday, September 9, 2014

7:00 - 9:00 pm Read more »

August 252014

Cross Passage Headwall Construction for Twin Tunnels Stage 2 – Southside Switch

What we are building

What:  A cross passage is a smaller tunnel placed between two other parallel tunnels for maintenance or emergency purposes. Crews will be building one headwall for the cross-passage required for future maintenance of the tunnels. Headwalls are underground support walls. Read more »

August 152014

Chaplin Station Headwall Construction for Twin Tunnels - Stage 3 Traffic Update - Work Zones have been shifted to the South Side of Eglinton

What we are building

What: Crews are building headwalls for the future Chaplin Station and cross-passages for the future maintenance of the tunnel. Headwalls are underground support walls located at the east and west ends of the station location. Following the site preparation, crews will be installing these underground station headwalls in advance of the twin tunnel construction.
  Read more »