February 072019
February 052019

Duct Bank Concrete Pour of Guideway from Eglinton Square to Pharmacy Avenue

What Work is Taking Place?

As part of continued support of the future surface alignment for the Eglinton Crosstown LRT, crews will conducting a concrete pour of the guideway in the center of Eglinton Avenue East between Eglinton Square and Pharmacy Avenue. Read more »

February 052019

UPDATE: Overnight Concrete Pour at Fairbank Station - February 8, 2019

What Work is Taking Place?

On Friday, February 8, crews will perform a large concrete pour at the Main Entrance area of Fairbank Station. The concrete will form the concourse level of the Main Entrance.  Concrete pumps will be placed in the work zone and one on Vaughan Road, and concrete trucks will queue in the southbound lane of Dufferin Street between Eglinton Avenue West and Hunter Street.  Dufferin Street and Eglinton Avenue West will remain open while work takes place, though traffic delays can be expected. Read more »

January 312019

Revised: Massey Creek Culvert Work Begins

Latest Update: March 18, 2019

What Work is Taking Place?

As part of the ongoing works to build the LRT system along Eglinton Avenue East, crews will be replacing the existing culvert at Massey Creek. Work began as early as late February 2019 and will last for approximately nine (9) months. The creek is located at the signalized intersection of Eglinton Avenue East and Rosemount Drive. Read more »

January 312019

Updated: Hydro Utility Relocation between Birchmount Road to Kennedy Road

What Work is Taking Place?

In support of construction of the future Crosstown Light Rail Transit, crews will continue relocation and upgrading of existing overhead and underground utilities between Birchmount Road and Kennedy Road. Work began in June of 2017 and will continue for another six (6) months. Read more »

January 282019

CROSS PASSAGE 10 CONSTRUCTION WORKS

Starting as soon as February 4th, an assessment of the existing dewatering system will take place at the Cross Passage site between Lillian Street and Redpath Avenue. Assessment works will take approximately five (5) days. Following the assessment the dewatering system will be recommissioned and will operate on a 24 hour basis. Periodic maintenance will be required.

 

TRAFFIC, TTC AND PEDESTRIAN IMPACTS Read more »

January 252019

Overnight Storm Sewer Connection Work at Brownlow Ave January 2019

What Work is Taking Place?

On January 30, crews will return to Brownlow Ave and Eglinton Ave to connect to the new storm sewer system installed last year.  Concrete will be removed so that crews can access the manhole below ground.  From there, concrete chipping and reforming will take place allowing the crews to connect to the new storm sewer infrastructure.  This work will be performed 24 hours per day.

Hours of Work Read more »

January 242019

MONITORING INSTRUMENT INSTALLATION OAKWOOD STATION

 

WHAT WORK IS TAKING PLACE

Crews are required to replace two monitoring instruments in the Oakwood Avenue and Eglinton Avenue West intersection.