March 242016
March 242016
March 222016

Subsurface Utility Engineering (SUE) Investigation along Eglinton Avenue East

What work is taking place? 

  • As preparatory work for the future at-grade stops continues, crews will be conducting SUE investigations along Eglinton Avenue East to determine the location and depth of existing utilities.
  • Working westward from Ionview Road to Victoria Park Road, crews will drill and use a vacuum truck overtop of existing utilities within the boulevard and roadway, then a surveyor will examine the utilities to obtain coordinates for design purposes.

When Read more »

March 112016

Updated Notice: Temporary Sewer Restoration Work - Walder Avenue

What work is starting?

What: In conjunction with the nearby Eglinton Avenue East sewer rehabilitation work which occurred this past winter, crews are restoring a man-hole on Walder Avenue, just to the north of Eglinton Avenue.

Why: This work is necessary to complete the restoration work for Walder Avenue, following a major sewer upgrade beneath Eglinton Avenue. Read more »

March 092016

Update: Vacuum Truck at Emergency Exit Building #3 (Overnight Work)

What work is happening?

Construction at the Emergency Exit Building (EEB) site at next to Leaside High School continues. The contractor is in the process of using a vacuum truck for the purpose of lowering the water level in the emergency exit building shaft, so that they can safely open the tunnel boring machine cutterhead to perform needed maintenance. 

Timing: Read more »