August 032017

Hydro Ductbank Connection Works at Ferrand Drive for Science Centre Station

What Work is Taking Place?

As part of ongoing utility relocation work for the future Science Centre Station, crews will be conducting hydro infrastructure work in the vicinity of Eglinton Avenue East and Ferrand Drive beginning as soon as early August 2017. Construction of hydro duct banks and installation of electrical equipment will be required to provide power to the station box. Read more »

July 142017

Median Removals on Eglinton Avenue East for Surface Stops

The surface section of the Eglinton Crosstown LRT will run down the centre of Eglinton Avenue East in dedicated transit lanes at street level. To prepare for the construction of the surface section, crews are working to get the roadway ready.

Setting up the construction work zones in the roadway will require changes to how car and truck, bus, and pedestrian traffic flows along Eglinton Avenue East and the associated intersections where future stops will be located. To conduct this work safely lane reductions will be required. Read more »

July 142017

Brentcliffe - Victoria Park Construction Liaison Committee Meeting

The construction liaison committee meeting of Brentcliffe - Victoria Park was held on July 13, 2017. You can see the presentation here:

Read more »

June 092017

Preparatory Road Works on Eglinton Avenue East for Surface Stops

Preparatory Road Works on Eglinton Avenue East for Surface Stops

The surface section of the Eglinton Crosstown LRT will run down the centre of Eglinton Avenue East in dedicated transit lanes at street level. To prepare for the construction of the surface section, crews are working to get the roadway ready.

Setting up the construction work zones in the roadway will require changes to how car and truck, bus, and pedestrian traffic flows along Eglinton Avenue East and the associated intersections where future stops will be located.  Read more »

June 072017

Update: Continued Works at Don Mills Spring-Summer 2017

What Work is Taking Place?

As part of the continued support of excavation works and utility relocations for the future Science Centre Station, traffic staging at the intersection of Don Mills Road and Eglinton Avenue East has changed to advance construction.  Read more »

June 022017

Brentcliffe - Victoria Park Construction Liaison Committee Meeting

The construction liaison committee meeting of Brentcliffe - Victoria Park was held on June 1, 2017. You can see the presentation here:

Read more »

May 102017

Traffic Reconfiguration at Don Mills & Eglinton: Nighttime and 24 Hour Weekend Work May 11 – 14

What Work is Taking Place?

As part of the continued support of excavation works and utility relocations for the future Science Centre station, traffic staging at the intersection of Don Mills Road and Eglinton Avenue East will be changing as early as May 11, 2017.  Read more »

May 102017

Ongoing Preparatory Works between Brentcliffe Road and Midland Avenue: Street Furniture Removals SPRING & SUMMER 2017

What Work is Taking Place?

As part of ongoing preparatory works, crews will begin the process of removing street furniture across the Eglinton Avenue East corridor between Brentcliffe Road and Midland Avenue. Read more »