Hilltop-Bathurst Laneway Closure for Equipment Installation

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

 
August 21, 2019

What Work is Taking Place?

Starting in August 2019, the Hilltop-Bathurst Laneway will be closed behind the Forest Hill Station Secondary Entrance site to make way for equipment installation.  Construction equipment will be installed at the north side of the Secondary Entrance.  Through access for vehicles will not be permitted.  Vehicles will be required to enter and exit the laneway from the same end which they entered; either from Hilltop Road or Bathurst Street.

Details
  • Beginning in late August 2019 for approximately six (6) months

Forest Hill laneway closure

What to Expect
  • The Hilltop-Bathurst laneway will be closed mid-block, behind the Forest Hill Station Secondary Entrance
  • Through access for vehicles will be unavailable; pedestrians will be routed around the closure
  • Noise from construction equipment can be expected
Travelling Smart during Construction
  • Sign up for e-mail updates at http://www.thecrosstown.ca/sign-up or download the aCrosstown traffic app to get real-time traffic and transit information for the Eglinton corridor.
  • Travel delays are expected with construction. Please allow extra time for your journey.
  • Traffic will be extra heavy at peak periods during Eglinton Crosstown LRT construction.
  • Download the free ‘aCrosstown’ traffic app to get real-time traffic and transit information for Eglinton Avenue.

 

Disponible en Français.