Lebovic Avenue

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

Syndicate content
September 062016

Pedestrian Safety near Construction Sites

Construction of the Eglinton Crosstown LRT line, including 15 underground stations, is underway. Since the end of school, many construction sites have been set up for station construction and the set-up of some major intersections along Eglinton Avenue has been changed.

Pedestrian Information Read more »

August 252016

Subsurface Utility Engineering (SUE) Investigation on Eglinton Avenue East for Future At-Grade Stops

What work is taking place? 

  • As preparatory works continue for future at-grade stops, crews will begin utility investigation work to determine the location and depth of existing utilities along Eglinton Avenue East between Victoria Park Avenue and Birchmount Road

What to Expect Read more »

May 092016

Update: Geotechnical Works continue along Eglinton Avenue East

What work is starting?

In February 2016, crews began conducting preparatory activities in the Eglinton Avenue East vicinity to make way for the future Eglinton Crosstown LRT. 

Upcoming works – geotechnical testing   Read more »