What's New?

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

 
Syndicate content
 
May 29 2019

Updated Traffic Configuration at Swift/Credit Union Drives and Eglinton Avenue East

Updated Traffic Configuration at Swift/Credit Union Drives and

Eglinton Avenue East

  Read more »

May 28 2019

ROAD WIDENING AND PAVING AT SLOANE AVENUE AND EGLINTON AVENUE EAST

WHAT WORK IS TAKING PLACE?

Throughout 2019, Eglinton Crosstown LRT construction will require temporary changes to intersection operations from Credit Union to Ionview for road paving and guideway construction. This work is required for the construction of the Crosstown LRT tracks and guideway (dedicated transit lane) in the centre of Eglinton Avenue East. Read more »

May 27 2019
May 24 2019
May 23 2019

UTILITIES CROSSINGS AT THE DON VALLEY PARKWAY RAMPS

UTILITIES CROSSINGS AT THE DON VALLEY PARKWAY RAMPS

WHAT WORK IS TAKING PLACE? Read more »

May 23 2019

UPDATED: ROAD WIDENING AND GUIDEWAY CONSTRUCTION ON EGLINTON AVENUE EAST AT THE DON VALLEY PARKWAY

Originally Posted: March 22, 2019

 

Updated: June 7, 2019

WHAT WORK IS TAKING PLACE? Read more »

May 21 2019

Extended: Upcoming Traffic Changes at Kennedy and Eglinton

Extended: Upcoming Traffic Changes at Kennedy and Eglinton

What Work is Taking Place?

As part of the continued support of excavation works (shoring) and utility relocations for the future Kennedy Station, traffic staging at the intersection of Kennedy Road and Eglinton Avenue East will be changing in October. Shoring began in April 2018 and will continue in phases at the intersection. Read more »

May 17 2019

New Traffic Configuration: Eglinton Avenue East between Jonesville Crescent and Victoria Park Avenue

WHAT WORK IS TAKING PLACE?

As part of utility relocations, road widening and road reconstruction along Eglinton Avenue East between Sloane Avenue and Victoria Park Avenue, new traffic staging (depicted below) will be implemented as early as May 21, 2019.  This traffic configuration will be in place for up to eight (8) weeks.

All works are in support of the construction of the Crosstown LRT tracks and guideway (dedicated transit lane) in the centre of Eglinton Avenue East.

Read more »