Fairbank-Oakwood Construction Liaison Committee Meeting

The construction liaison committee meeting of Fairbank and Oakwood stations was held on August 8, 2017. You can see the presentation here:

Read more »

August 032017

Site Service Connections at Oakwood Station

What work is taking Place?

Crews will complete temporary water and sanitary connections at the Main and Secondary Entrance. Read more »

July 202017

Crane Delivery and Installation at Oakwood Station

What Work is Taking Place?

 

A large overhead crane will be delivered and installed at the Oakwood Main Entrance starting the week of July 24th.   Read more »

July 122017

Upcoming: Shoring and Excavation at Oakwood Station

 

Since 2016, shoring and excavation work has been underway at the main and secondary entrance sites for the future Oakwood Station. Excavation at the Main entrance is currently underway and will be followed by mining operations in late 2017.  Read more »

May 172017
April 132017

Construction Material Storage for Oakwood Station

Construction Material Storage for Oakwood Station 

 

What work is taking place?

  Read more »

April 072017

Fairbank and Oakwood Stations Open House

Thank you for attending our Fairbank and Oakwood Stations Open House on April 6, 2017.

For those of you who missed it, the presentation is here:

Read more »

March 312017

LOW WATER PRESSURE NOTICE: Watermain Investigation Work

What Work is Taking Place?

On April 3, 2017, crews will begin subsurface utility engineering (SUE) investigation of a large 900mm watermain in the Eglinton Avenue West and Chaplin Crescent area.  The watermain will be exposed to determine the utility and ground conditions in advance of wet utilities relocation.  Most of the work will take place within the existing traffic staging at Chaplin Crescent and Eglinton Avenue West. Read more »

March 292017

Geotechnical Equipment Installations and Monitoring at Oakwood Station

Geotechnical Equipment Installations and Monitoring at

 Oakwood Station 