What's New?

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

 
Syndicate content
 
September 22 2017
September 20 2017

Preliminary Notice to Businesses and Residents: Upcoming Power Outage Between Birchmount and Kennedy

What Work is Taking Place?

Since June 2017, crews have been upgrading and relocating existing hydro utilities in the area located just west of Birchmount Road to Kennedy Road in the vicinity of Eglinton Avenue East. To complete this work, a Hydro outage is required.

Hours of Work Read more »

September 19 2017
September 19 2017

Mining at Laird Station Main Entrance

The Eglinton Crosstown includes a 10-kilometre underground portion, between Weston Road and Laird Drive, where 15 below-grade stations are under construction. Eleven will be built using a “cut-and cover” method and four, including Laird Station, are going to be “mined.” 

Excavation of the main entrance at Laird Station is complete and mining will begin soon. Read more »

September 18 2017

Site Service Connections at Oakwood Station

What work is taking Place?

Crews will complete temporary water and sanitary connections at the Main and Secondary Entrance. Read more »

September 15 2017

Overnight Stormwater Relocation Work Week of September 17 for Science Centre Station

What Work is Taking Place? 

 Crews will relocate an existing stormwater on Eglinton Avenue East just east of Don Mills Road to support the upgrade of existing water infrastructure at the future Science Centre Station.

Timing Read more »

September 15 2017

Update: September 24th Closure of West Underground Pedestrian Tunnel at Eglinton Station

What Work is Taking Place?

Support of excavation (shoring) for the new Eglinton station will require closure of the underground pedestrian tunnel at Yonge Street and Eglinton Avenue leading from the Eglinton TTC subway station (pictured below) to the Riocan Yonge-Eglinton Centre. Read more »

September 15 2017

Upcoming: North Entrance Closure and Demolition at Kennedy Station in Fall 2017

We have been busy building you the new 19-kilometre Eglinton Crosstown light rail transit (LRT) line!

This has involved lots of moving parts — excavations at future stations, relocating and upgrading utilities, road widening, and center-medians removal work for future stops.

Now we are working at the eastern end of the Crosstown LRT line at Kennedy Station — a future interchange station (pictured below). Read more »

September 15 2017

Traffic Change at Fairbank Station

What Work is Taking Place? Read more »

Categories:
September 14 2017

Sewer Re-lining Works at Laird Station

Sewer re-lining is a process intended to increase the durability of the sewers.  At Laird Drive and Eglinton Avenue East, local sewers will be re-lined in the vicinity of the construction sites. 

The liner is a flexible membrane that is placed inside the sewers. Lining is designed to be generally non-disruptive and eliminates the need for excavation of the entire sewer section. The required activities take approximately three days for each sewer section.  Read more »