April 25 2018

Pharmacy to Kennedy Construction Liaison Committee Meeting

The construction liaison committee meeting of stops and station between Pharmacy and Kennedy was held on April 24, 2018. You can see the presentation here: 

April 24 2018

Mt. Pleasant Road Closure and Overnight Work: April 27 – 30, 2018 and Overnight Water Shut-off on Friday April 27

 

What Work is Taking Place?

Since April 14, crews have carried out weekend closures of Mt. Pleasant Road between Eglinton Ave E and Roehampton Ave to perform hydro utility relocation work. As part of this work, a watermain cut-and-cap will be performed, requiring a temporary water shut-off.  Read more »

April 20 2018

Upcoming Works at Eglinton Station: Next Phase of Support of Excavation

What Work is Taking Place?

Support of excavation work, also known as shoring, has commenced to make way for the future Eglinton interchange station. This work will include pile installation, jet grouting and road deck installation. Shoring will be conducted in phases, beginning in the former TTC bus depot on the southeast corner of Yonge and Eglinton and along the south side of Eglinton Avenue between Duplex Avenue and Holly Street.  Read more »

April 20 2018

Large Tower Crane Delivery at Science Centre Station

Orignally Published: April 20, 2018

Updated: April 25, 2018

What Work is Taking Place?

On Saturday, April 28, 2018, a large tower crane will be delivered to Science Centre Station. The tower crane will be erected within the existing construction zone on Eglinton Avenue East, west of Don Mills Road.    Read more »

April 20 2018

Fairbank & Oakwood Construction Liaison Committee

The construction liaison committee meeting of Fairbank and Oakwood was held on April 19, 2018. You can see the presentation here:

April 19 2018

UPDATE: Pedestrian Route Changes at Leaside Station

ORIGINAL POST: APRIL 6, 2018

RE-ISSUE DATE: APRIL 19, 2018

 

WHAT WORK IS TAKING PLACE? Read more »

April 19 2018

Central-West Open House (Caledonia Station to Forest Hill Station)

Thank you for attending the open house about Caledonia Station to Forest Hill Station on April 18, 2018.

For those of you who missed it, the presentation is here: Read more »

April 18 2018

Additional Dewatering Wells for the Avenue Station Main Entrance

WHAT WORK IS TAKING PLACE?

The term “dewatering” means pumping water from the ground at a site where there will be excavation. At Eglinton Avenue West and Avenue Road, small wells have been drilled around the entire station box where the underground mining excavation will be taking place. The dewatering system is installed in two phases, drilling of the wells and then digging shallow trenches to connect the wells and lay the pipes, pumps, and valves for the system. The volume of soil that requires dewatering is significant.  Read more »